Hi,
as per the existing settings of our system , when we run standard cost for a material through CK11N , though some errors are there , system is allowing to save the cost and latter we are encountering the issue of "existing standard cost can not be used "
what settings are required to stop the concerned to save the cost with any errors
please help
regards,
madhu kiran