Hi,

When I try to run costing run CK40N for KMAT material, I am geting information "No materials selected" for the 'selection' flow-step.

Below is the Error description.

-


No materials selected

Message no. CK277

Diagnosis

Due to the costing variant used, no materials could be selected for the cost estimate.

System Response

No materials were selected.

Procedure

1. First, check that the materials you want to cost exist.

2. Then go into Customizing and check the costing variant, the reference variant, and the transfer control. If the plant changes, a suitable transfer strategy must be entered in the transfer control belonging to the reference variant.

-


Thanks in Advance,

Shiva