Hello,
a production order was created (100001125). The production order has a basic start date of 6/24/2009 and was released on 6/24/2009. The Shelf life exp. date calculated (50 day shelf life) as 8/13/2009 (which is correct).
On the Long Text tab, the DLC: reflects 12.08.09 which is incorrect. In addition, the batch (1110062909) also reflects a Shelf Life Exp. Date of 8/12/2009 (which is incorrect) but the manfactured date is 6/24/2009 already. Also, in the batch screen under the Classification tab, the Max. shelf life/Age in secs. reflects 4,233,600.000 which is actually 49 days when it should be 50 days.
The expiry dates should match in the production order and batch. This does not happen all the time. Why does it happens on our production order? what should be the reason and where should we have to correct this one?
Thanks
Please help.
Edited by: Agent X44 on Jun 29, 2009 12:34 PM