Skip to Content
0
Former Member
Jun 26, 2009 at 08:37 AM

creating a customised put away strategy

41 Views

Hi

Can you please explain me whether we can create our own put away strategy based on the MRP(Maximum Retail Price) of a material.?

it means same material having different MRP should not get merged into a single bin.

I cannot use it at batch level because my batch characters are on monthly basis.E.X. 200812,200901,200902.

it always happens that different batches will quite often have same MRP.So if i use at batch level then i loose lot of space in my WH because it keeps booking the fresh GR into to next empty bin

but i dont want to store them into separate bins as i loose space in my WH.

Instead i want to store the materials having same MRP (belonging to either same batch or different batch) in a same bin and different MRP into different bins irrespective of batches.!!

can i develop a put away strategy satisfying this requirement.??

thanks in advance for your response on this.

regards

Venkat