Log size requirement date

33 Views

Hello Gurus,

We are using lot size MB, the system normally interprets the period start of the planning calendar as the availability date we configured to be interpreted as the delivery date.

Would like to know we can set this delivery date as the requirement date of the Dep Requirements instead of the period start date. For example if the requirement date is 06/29 the mateiral is made available on 06/01 instead we want the material to be available anytime between 06/25 and 06/29 so that we can cut down the cost of the inventory.

Thanks in advance for your help

Regards

Srini