on 06-22-2009 11:16 AM
Dear all,
I have one issue over here.Measuring point/document is not updating automatically after productiuon order confirmation . I tried with following steps
1) Created the equipment as test equipment -->created measuring point as a counter ---> maintain the usage value formula SAPF02 in the PRT tab . Unit of measurement for the characteristics and base unit of measure of material are same
2) Then i have assigned this eqipment as a PRT in the routing of material .
Which steps i am missing
Thanks
hi
in the production order ,operation overview whether can you able to see the PRT assigned with the measuring point and the formula ,also check in which unit you are cofirming the production order ,it should be same as characteristic you have used
regards
thyagarajan
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
99 | |
11 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.