cancel
Showing results for 
Search instead for 
Did you mean: 

Handling unit configuration

Former Member
0 Kudos

hi,

I would like to know the configuration & mandatory things about Handling Unit Mgmt.

how to do GR & GI if HUM is assigned???

pls dont put sap help files....

regards

raj

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Raj,

Inthe below link you can find one PDF,which is having the complete step by step to config the HU.

http://help.sap.com/bp_bblibrary/600/Documentation/G74_BB_ConfigGuide_EN_US.doc

Former Member
0 Kudos

hi

can anybody tell methe basic tracsactions for HUM???

regards

raj

Former Member
0 Kudos

Hi,

Following are the major transactions which we use for HU (inbound & outbound).

HU02                 Creating and Changing Handling Units
HU03                 Display of HUs
HU04                 Creation of HUs with stock
HU05                 Display of HUs for object
HUCANC               Matl Doc. Cancellation of HU Gds Mvt
HUCOWA               Display Staged HUs
HUCOWE               Display Manufactured HUs
HUDIFF               Adjustment of HU Stocks
HUEX                 Number Range Maintenance: HU_VEKP
HUGO                 Settings for Travel Planning
HUIBD                Handling Units for Inbound Delivery
HUIND                Database Indexes for Handling Units
HUINV01              Create HU Phys. Inventory Documents
HUINV02              Change HU Phys. Inventory Document
HUINV03              Enter Counted Qty for HU Phys. Inv.
HUINV04              Analysis of HU Phys. Inv. Documents
HUINV05              Post HU Phys. Inventory Differences
HUINV06              Delete Inventory Status for HUs
HUINV07              Display HU Phys. Inv. Documents
HUMAT                Handling Units Related to Matl Doc.
HUMO                 HU Monitor
HUNK                 Number range maintenance: LE_HU
HUNKUMP              Number range maintenance: LE_HU_UMP
HUOBD                Display HUs for Outbound Delivery
HUP1                 HU creation in production
HUPAST               Packing Station
HUPAST_C             Customizing -Packing Station Profile
HUPASTW              Packing Station
HUTRA                Display HUs for Shipment

Incase of Automatic Packing

POF1                 Create Pkg Instruction Determination
POF2                 Change Pkg Instruction Determination
POF3                 Display Packing Instr. Determination
POP1                 Create Packing Instruction
POP2                 Change Packing Instruction
POP3                 Display Packing Instruction
POP4                 Deletion flag undo for pack.instr.
POP5                 Determination of Pkg Instr. Use

Former Member
0 Kudos

hi

can i know the process flow of GR & GI.(if a plant is asigned to HUM)

thanks

raj

Former Member
0 Kudos

Hi,

Basic customization in HUM

Spro>LOGISTIC GENERAL>HUM

Define Packaging Material Types

Define Material Group for Packaging Materials

Define Allowed Packaging Materials

Set Profile for Packing Station (iF YOU ARE USING hupast FOR CREATING HU)

Set QM Check and Delivery Type for Each Movement Type

HU Requirement for Storage Locations and Default Values for Deliveries

Maintain Allowed Goods Movements

Maintain Packing Transaction Profile

Determination of Packing Instructions

Now please tell me yours process first so that i can tell you how HUm will operated

Thanks and regards,

Vishal

Former Member
0 Kudos

Hi,

I'm kinda new to handling unit as well and was hoping for some help. I currently have no idea about handling units and don't have any help files and such. The process being currently followed is:

- A batch of material is created and is brought to a weighing scale.

- Weighing scale reads the weight and a "print" button is pressed on the scale.

- A Visual Basic Program listens to the weighing scale on the Comm port, performs string manipulation and sends the weight to SAP.

- A sticker is printed with the batch number and weight on it.

Now here is where the mess starts. Currently the entire manufacturing cycle in SAP is ABAPed. An ABAP program reads in the weight sent from the VB program, tare weight is subtracted and the batch is temporarily stored in Z table. At the end of a production shift, another ABAP program is executed which then uploads the data in the temporary table to SAP tables.

I was wondering if at least the weighing scenario, packing material and printing could be handled through HUM. Any comments/suggestions/help would be greatly appreciated!

Thanks,

-Z-

Former Member
0 Kudos

This message was moderated.

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi,

I think the best way to understand in SAP help file.

If you will read only 3 pages step by step, you can understand the complete process of HU.