Hello Guy's,
I hope some can help me with a PO change issue in SRM. We have an Asset PO in SRM(ECS) which has been put on hold as it went into. When i look at the R/3 PO the GR based IV has been ticked. But when we go in SRM to make changes it does'nt allow because the PO has backend error. Is there a way we can get rid of the error.And when we look at the application monitor. It says.
1) GR based In verification not allowed.
2) PO object cannot be changed.
Is there a way where we can transfer the these change through to ECC.
Thanks in advance.
Rgds
Saj