Jun 17, 2009 at 01:59 PM

Equipment Calibration

38 Views

Dear All,

I am implementing equipment calibration in one of our client .

I have one issue. In case of equipment calibration suppose sheduling start date is 17/06/2009 and calibration frequency( cycle time ) is 10 days. Now when i will shedule the maintenace plan today i.e 17/06/2009 for this equipment system is creating maintenace order hence inspection lot today only .

The system is showing shedule date in sheduling overview correctly as 26/06/2009 and inspection date in inspection lot as 26/06/2009.

But

My requirement is that the system should generate order and inspection lot on its due date only that is on 26/06/06 because If i sheduled the background job today for these equipment the system will generate inspection lots today only .

Thanks

Amol