Hi
I would like to find the link between the Schedule Lines (of Scheduling Agreement) and the GR document. i.e. which GR has been made against which Schedule Line. I have checked the tables EKET, EKBE, MSEG but there is no link with the Schedule Line, I found the link only with the item number there.
Thanks
Prashanth