Dear all,
We have two system system landscapes / logical components (Dev -> Tst -> Prd) in parallel; Finance and Logistics.
Is it possible, to have them both in one Maintenance project?
And more important, to have them both available in the project logistics task list (/TMWFLOW/PROJ).
How do I arrange the parallel transporting eg. for Dev_FI -> Tst_FI and Dev_LO -> Tst_LO?
Thanks for the answers,
jan