Skip to Content
0
Former Member
Jun 17, 2009 at 11:06 AM

System Refresh for ECC & PI in Oracle MCOD database

28 Views

Hi All,

We are running our ECC system on linux and oracle. Our ECC Development system and PI Develeopment system is running on one box and on the same database (MCOD). The same is with the ECC production and PI production running on the same system and same database (MCOD).

Now our requirement is to refresh the ECC development system from ECC PRD system. But we don't want to do any changes in PI system. One option is that we can export the DEV Pi schema by running SAPINST and than refresh the ECC DEV system with ECC PRD system.

After this we will install fresh PI where it will ask for DB export we will give the path of the PI export which we have taken. But i am not sure this is possible or not. Is this possible??

Or Is there any other easy possible ways to do it?

Thanks,

Bhanu

Edited by: Bhanu Pratap Singh on Jun 17, 2009 4:36 PM