Dear Experts,
Our client has following scenario.
Please help to track it.
Threre are two types of material.
Finished good say FG
Raw Material say ROH
For 1 kg of FG we need 1 kg of ROH.
But,
ROH is purchased in the lots of 2 kg, 2.5 kg. and we have to directly use these lots in production.
For Example,
FOR 100 kg of FG we need 100 kg of ROH but it may be
50 lots of 2 kg OR
40 lots of 2.5 kg
Now we want lotwise availability cheks in MRP then how to mentain the BOM.
we have mentained base unit of ROH as kg therefore the system tells us for 100 kg u require 100 kg of ROH. but the system does not tell us which lots are available and which lots should be used for production.
Can this be mapped in SAP.
Thanks.