I am trying to configure the following setup without S&OP, though I would welcome ideas that include it.
"I know the amount of raw material in stock and based on this figure, I know how much finished goods can be made of a given strength (concentration, potency et al). Since planning from SAP is primarily Finished good to raw material, is there any way the planning can be made the other way around. The component produced here is a semi-finished good."
This is not an uncommon scenario, esp in chemical industries. I however cannot trace where in SAP is this feature hidden (if at all it is present).
Thank you for replying.