Skip to Content
0
Former Member
Jun 16, 2009 at 02:16 PM

routing of a configurable material, can't change the operation

9 Views

hi all,

i have problem with the routing of a configurable material,

when i go to change routing transaction and go to operation detail, i find that the operation lists are in display only mode, i can not change them, if i delete one of the operation then all the operation gets deleted.

kindly let me know if this is a standard system behavior that a routing for a configurable material can not be changed????

or am i missing out some standard procedure to do that???

best regards,

Maulin