cancel
Showing results for 
Search instead for 
Did you mean: 

number range

Former Member
0 Kudos

Hi, we want in one plant, for 1 type of products number ranges to start with "AA000001" and so on and the second product related order with "BB0000001". How to set AA or BB as suffix for the number ranges?

Accepted Solutions (1)

Accepted Solutions (1)

rupesh_brahmankar3
Active Contributor
0 Kudos

Dear,

please use of tcode MMNR for creating the no range for material.

You have to use exit MGA00002 - Material Master (Industry): Number Assignment

Also there are following Function Modules;

EXIT_SAPLMG02_002 - Customer Exit: External Material Number Assignment.

If you are talking for production order number range then you need to create two different order type and assign it in CO82.

Regards,'

R.Brahmankar

Former Member
0 Kudos

Hi, my req is for prod order number range. i want to start order number with AA & BB for 2 different parts. how to set the system for the same.

Answers (1)

Answers (1)

gabriel_souza
Explorer
0 Kudos

Hey

have you checked OPJH for this?

Bye

Gabriel Souza