How to use standard SOP standard analysis report for S093 and S092?

Former Member
0 Kudos

Hi everyone,

I have been trying to use Standard SOP and track de capacity for Materials, PRTs and Costs, but I have found some issues.

a) In standard analysis report for info structure S093 (Materiales and PRTs) I can get the required capacity and the available capacity columns filled, but not the Capacity Load % column.

b) In the standard analysis report for info structure S092 (Costs) I get the columns popullated, but I see my costs are doubling what I should be expecting.

The process I followed:

  1. MC84 - Created a product group with 2 Finished Goods
  2. MC35 - Created the Rough-Cut Capacity Planning Profile for the product group (time span = 5, base quantity = 1,000) and added to the Resource table 1 Work Center (which capacities get planned great in MC82) = 1 hour, 1 Material (which required and available capacities are planned ok, but capacity load is 0%) = 1,000 pieces, 1 Cost element (which gets doubled in S092) = 1USD.
  3. MC9K - Create material availability for the material I added in MC35
  4. MC81 - Created a plan with an active version A00 based on the forecast of both Finished Goods.

As I said, capacity is being calculated for Work Centers correctly, but I have thoes two issues with Materials and Costs.

Any ideas?

I appreciate your help!

Regards!!!