on 06-15-2009 10:43 AM
Hi experts,
I have configured OH calculation through OPL1.Then i try to configure Overhead structure through KSAZ.
In oh structure,i have to define following data:
Row Base O/H rate Description Fr To Credit
10 B000 Material
20 C000 Material OH 10 E01
But while i want to save it following errors comes:
Overhead C000 does not exist.
And while i put depedancy in D000 there,errors comes:
Condition D000 does not
Please advise.
Regards,
Samar
Hi Samar,
You have to maintain the base rows for costing sheet. Maintain C000 in KZB2 & then include it in your costing sheet. Tcode for maintaining Costing Sheet is KZS2.
Dependency D000 is a SAP default template which you need to select while configuring Overhead Percentage rates in KZZ2. From given options select D000.
Hope this gets you going.
Thanks,
- Mahak
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Not answered
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi experts,
Please advise.
Regards,
Samar
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
110 | |
12 | |
11 | |
6 | |
5 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.