Hi experts,
I have configured OH calculation through OPL1.Then i try to configure Overhead structure through KSAZ.
In oh structure,i have to define following data:
Row Base O/H rate Description Fr To Credit
10 B000 Material
20 C000 Material OH 10 E01
But while i want to save it following errors comes:
Overhead C000 does not exist.
And while i put depedancy in D000 there,errors comes:
Condition D000 does not
Please advise.
Regards,
Samar