The requirement of Mat "X" in WBS1.1 is 50 and WBS1.2 is 100, are grouped at WBS1 using group functionality.
1.Is it possible to check the Budget availability for 50 Qty at WBS1.1 and for 100 at WBS1.2 element?
2.If the requirement are generated using advance planning then can it be possible to have budget control at respective WBS thou req. are grouped?