cancel
Showing results for 
Search instead for 
Did you mean: 

Overhead issue:KGI2

Former Member
0 Kudos

Hi experts,

I have configured following for overhead calculation through OPL1.But when i run KGI2 for a particular production order ,,i have found that nothing is coming.

Please advise.

Regards,

Samar

Accepted Solutions (0)

Answers (5)

Answers (5)

Former Member
0 Kudos

solved

Former Member
0 Kudos

Hi experts,

How i can do the link in between Overhead structure(KSAZ) and cost sheet.

Please advise.

Regards,

Samar

Former Member
0 Kudos

Hi experts,

How i can defined overhead key in Material master.

Please advise.

Regards,

Samar

Former Member
0 Kudos

Hi Samar,

You cannot assign Overhead key in material master. You need to assign overhead key to overhead group & overhead group will be assigned to material master in "Costing 1" View.

Here are the steps :-

- Assign a costing sheet to your production order

- Enter overhead charges in costing sheet that use the overhead key field.

- Assign the overhead key to an overhead group.

- Enter this overhead group in the material master record of the material.

Tcode for

Defining Overhead Key - OKOG

Assigning Overhead Key to Overhead Group - OKZ2.

Thanks,

- Mahak

Former Member
0 Kudos

Hi experts,

Thanks for the reply.

How i can assign costing variant to production order.Is there any T code.

Please advise.

Regards,

Samar

Former Member
0 Kudos

Hi Samar,

You can assign Costing Variant to Order type in Tcode OPL8. The settings will flow from respective order type to Production order. Menu Path for this Tcode is Production --> Shop Floor Control --> Master Data --> Order --> Define Order-type dependent parameters.

Hope this will solve your problem.

Thanks

- Mahak

Edited by: Mahak Birla Mantri on Jun 17, 2009 8:40 AM

Former Member
0 Kudos

Hi Samar,

once again check the cost sheet used for Overheads determination....use the check functionality in cost sheet. check whether costing sheet is assigned to costing variant or not and this costing variant to production order.

Check overhead key is defined in Material master o not..

Regards,

Hari.