cancel
Showing results for 
Search instead for 
Did you mean: 

system copy

Former Member
0 Kudos

Hi,

We are planning to do a system copy for BW system from production system to quality.We are using ECC 6.0,DB2,Solaris.Please tell me the steps how to perform the system copy?

Regards,

Mani

Accepted Solutions (0)

Answers (4)

Answers (4)

Former Member
0 Kudos

Hi Manji,

Please check the below mentioned SAP notes for better understanding. It may help you.

184447

886102

1333302

You can find link and pdf attached to this note. There you can find special things needs to be done for BW system copy . Please check it out.

Thanks

Raj

Former Member
0 Kudos

Hi,

System copy :- Two type of system copy are

1.Homogenous System Copy :-Both the operating system and the database system stay the same during the system copy.

2. Heterogeneous System Copy:-One of the following is changed during the system copy:

u2022 Operating system (in this case, the system copy is called OS migration)

u2022 Database system (in this case, the system copy is called DB migration)

u2022 Operating system and database system (in this case, the system copy is called OS/DB migration)

You need to donwload system copy guide for your DB, OS & SAP release from

service.sap.com/instguides & follow all steps as mentioned.

You need to do further post-processing steps after the system copy which are also mentioned in the doc.

Also check below links.

http://www.basisconsultant.com/index.php?option=com_remository&Itemid=185&func=fileinfo&id=10

Hope this helps.

Thanks

Sushil

Former Member
0 Kudos

Hi,

IF UR PERFORMING SYSTEM COPY BOTH ABAP AND JAVA WILL BE COPIED

BEFORE STARTING SYSTEM COPY IN TARGET SYSTEM(QUALITY) EXPORT DB IN CONFIG TOOL

Regards,

Renu

Former Member
0 Kudos

hi,

can you look at this

[]

[https://www.sdn.sap.com/irj/scn/advancedsearch?cat=sdn_all&query=systemcopy&adv=true&sdn_author_name=&sdn_updated_on_comparator=GE&sdn_updated_on=]

[https://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/6945da7d-0c01-0010-1792-dd7b5d87235c]

Regards,

Muralidhar

Former Member
0 Kudos

Hi,

If i perform the system copy it will change both Abap and java stack?

Regards,

Mani

Former Member
0 Kudos

Hello,

If you are using backup / restore method yes both ABAP and JAVA will be copied. You also have a option from installation master to select ABAP + JAVA based system copy

Regards,

Anand