Skip to Content
0
Former Member
Jun 12, 2009 at 05:17 AM

Batch Job

78 Views

Hi,

I need to create a batch job.

In the selection-screen in have made one of the date parameter as sy-datum.

When i create a variant today that variantw will have todays date, and if i need ot run the same variant

tomorrow the date is getting vanished.

How can i make the date in the variant i create as sy-datum

What are the steps involved in creating the batch job and creating the variant with default sy-datum.

Pls help.

Thanks.