Skip to Content
avatar image
Former Member

Posting in Locked Cost Center

Hello All,

Cost Center C100 is locked from posting by selecting all lockk fields so system will not allow to post any value to that cost center.

We have work center W100 with having Cost Center C100.

This Work center W100 is assigned in Service Order with some activities.

When we are confirming Service Order system calculates actual activity cost and loaded it on Cost Center C100.

How system allows me to post cost on Cost Center C100 when it is locked? Why system is not throwing an error message?

If we change the cost center from work center with new Cost Center C110 what will be the impact on existing service order created but not confirmed.

Regards //KP

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

1 Answer

  • Oct 24, 2017 at 05:41 AM

    Hi KP,

    This is sap standard behavior, check this note 1919456.

    Thanks

    Add comment
    10|10000 characters needed characters exceeded