Hi, say we have 10 operation. at the end of ea operation we have inspection. At 2nd operation we take one sample from the main product. that sample must be checked for mechanical properties in lab before completion of all 10 operations. based on lab mech report, the product must be finally passed or rejected. we wants to have a pop up saying that "verify sample mech properties" at the end of 3rd operation to the last operation so that the qa inspector will not forget to verify the sample mech properties. pls advise how to map the same?