Former Member
Jun 10, 2009 at 11:30 AM

production line in rem process

57 Views

Hi All,

We are in the Rem process, we maintained the workcentre as production line (0007) and assign this work centre to the Rate routing.

we have 10 machines (each machine do one operation) in the production line. now we need to split this production line into 10 workcenters in the routing.

i have the question for this.

1. i need to have different activity type for each work center. since we assign all the WC to single cost center.

2. if we need to do the rework in the mid of the operation sequence . shall we had the rework as the operation in the rate routing that normally used

3. If we split the production line.can i use the workcenter category as 0001 and use the processing formula as SAPR06 Rate: Machine rqmts or i need to change the processing formula which is normally used for the 0001.