Skip to Content
0
Former Member
Jun 10, 2009 at 06:03 AM

Error in Changing cost center analysis period

46 Views

Posted: Jun 10, 2009 8:00 AM in response to: Sridhar Vasudevan Edit Reply

Hi,

My requirement is as follows:

Create an analysis period beginning with first day of the period that is being closed (get the analysis periodu2019s month and year from table TVARVC, variable = u2018Z_PROC_CURR_DATEu2019 and concatenate u201C01u201D to it to arrive at the first day of the month). End of the analysis period is always 12/31/9999

Current date in TVARVC is 4 june 2009

But here when i concatenate 01 to 4 june 2009 i.e. 060901,then it is throwing error -new analysis period must not exceed maximum period limit.

Please help in this case.

Thanks and regards,

Meena

Edited by: meena sharma on Jun 10, 2009 8:04 AM

Edited by: meena sharma on Jun 10, 2009 8:05 AM