Dear PP experts,
I have a FERT material with two batch sizes maintained in material master MRP 1 view mini. and max. lot size. In MRP 4 view I have maintained selection method as selection by production version option "2".
I have created 2 BOM and two recipes for the FERT material as per the batch sizes.
I have maintained quota for the required production version (1st production version) in MEQ1 as 100 % so that system can create planned orders of only alternate 1. When I put a plan for the FERT material in MD61 and run MRP and check the results in MD04, system creates the planned orders as per the bigger batch size but shows the required production version in the planned order.
My requirement is that only planned orders of smaller batch size should be created with the required production version. Pl. let me know how can I achieve this.
Regards,
Prashant