Hello Everybody,

We are in the process of upgrading our R3 ECC 5 SPS20 system to ECC 6 incl EhP4.

We have already downloaded the required Upgrade software from SAP marketplace.

We have started the Upgrade program and finished Initialization and Extraction Phases successfully.

In Configuration phase Upgrade program is in need of SPSTab.xml file for EhP4.

We are unable to proceed with the upgrade without the SPSTab.xml file.

As per the upgrade guide, we are supposed to download the SPSTab.xml file from Solution Manager.

But in solution manageru2019s maintenance optimizer, we are not able to provide the Source system as ECC 5 and Target system as ECC 6 with EhP4.

Currently the system HP1 is configured with product version ECC 5.0

Also I would like to know whether is it possible to Upgrade an ECC 5 system directly to ECC 6 incl EhP4 ready.

Kindly suggest a solution.

Thanks in advance.

Regards,

Venkatesh Pydi.