Hello,
We are finalizing the sizing of our future BI.7 environnement.
As designed, the BI7 server capacity will be determined by the SAPS/memory quicksizer results.
But in addition to that, to be on the safe side, we have also to keep in mind that our BI.7 database server must be SAPS scalable,
In concrete terms, it means bying a much more expensive server than expected.
Besides, we are also planning on deploying BIA next year. So we figured that since the Accelerator contributes to reduce BI workload (data read, rollup, change-run, etc), we won't need that much CPU
in the future.
Based on your BIAccelerator experience, what you think of thoses assumptions ?
Thank you for your attention and your help.
Best Regards.