I have gone through the threads in w.r.t collective order and direct production. the sap help (IDES too) and the ERP documentation. I still cannot trigger get a process order to be directly created for the subcomponent when I convert the parent planned order (superior planned order).

My BOM structure is the standard FERT-HALB-ROH.

I have setup sp proc key 52 for the halb, BOM and recipe are valid and they are linked to a prod ver. I see a DEP req for the FERT material in the HALB's MD04 screen after I run MRP for the FERT.

I know this setup works for production order. I am however trying with "process orders" since this is required for a PI based inventory. Is this possible?