Former Member
Jun 08, 2009 at 09:38 AM

Material Staging for Production Order

399 Views

Hi,

I am doing Material Staging against production Order using T Code MF60. We don't have WM setup in the enterprise structure so the Staging is done via IM Mvmt. Type 311. My problem is that the material document created using MF60 does not have a reference of Production order or vise versa. Can anyone suggest a configuration or a user exit that can be used to make a reference link between the Production Order and the Staging Document?

Thanks

Arvind