Hi,
(1) hOw can i deifferentiate between B/D and corrective maintenance in definition and also in sap stad. Bec as per std sap corrective maitenance is done in 5 steps while b/D restritade to 3 steps bec b/D need immediate attention. bd which directly affect to production and corrective not , is it rt in sap.
if yes so as per sap std orter cretade and rel at same stage , can we control it.
(2) if order is relesed , after that i need some material , how can i issue material in sap and store also. wr i ll update .
(3) how can i control , if notification status is NOPR , the order should be creatde.