on 08-16-2018 8:21 PM
Hello everyone,
I'm currently facing an issue with a BRF+ application. In the development and quality systems everything seems okay, the application itself in the productation system also "looks" okay (equivalent with D/Q), although when I check the trace I can see that an older logic runs if I call the app in the P system.
I already tried all the relevant note tips (mass check, reimport etc.), but apparently some older version of the app "stuck". Could you please help me with this?
The trace shows there is an exit condition in the ruleset (1st condition). But there is no sign of this exit condition in the app itself (both shots are from the P system).
User | Count |
---|---|
84 | |
10 | |
10 | |
9 | |
7 | |
6 | |
5 | |
5 | |
4 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.