Dynamic Safety Stock and Calculate based on past consumption

120 Views

Hello experts,

I have set up my coverage profile in configuration for dynamic safety stock. However, the value is going off of the current net requirements in the system. How do I set it up so that the target stock level (DSS) is determined by 30 days of our past consumption and so many days of near future requirements?

I assume I need to set up the MRP 3 tab in a specific way. These materials that will be using dynamic safety stock are not forecasted, therefore, the material master had PD as MRP type (not VM or VV as discussed for setting DSS with forecasted materials), lot size of DY, and the coverage profile.

Please let me know.

Thanks.