Hi,
I have to installed a EHP1 on our BI 7.0 system where ABAP and J2EE are seperate instance on same host.
How would I proceed?
Do the ABAP first then J2EE seperate after ABAP.
I just did for SolMan and I used ABAP+J2EE guide.
I am little confused for BI where BI ABAP and BI J2EE SIDs are different.
I just need very high level idea, how I should proceed. I have to read the guide eventually but this will speed up the process little bit.
Your guidance will be appreciated.
Regards,
SC