When I run the sequencing heuristic for product attributes ,it was working today on all the lines except the Dual line. It did not try to re-sequence that resource for some reason. Here’s a copy of the log file
Diagnosis
Given the complexity of the planning problem, system could not find any scheduling dates with in maximum number of solution steps configured internally
This can have following causes:
1. With the existing load situation on resources, it's not possible for an operation that consists of several activities to do a suitable slot
2. There are relation ships between activities that have maximum time intervals that either cannot be met or can be met with great difficulty
System Response
System dose not schedule or reschedule