Hi,
My client practice is, their production plan will be in batches,whose size vary from time to time.
their requirement is, to track
1) planned cost for the batch (say batch size is 20 nos,)
2) planned vs actual cost of the batch.
Pl. guide me how should i map this scenario in SAP.
regards,
K.Kumar.