Skip to Content
0
Former Member
Jun 05, 2009 at 04:39 AM

rework operation in the routing

178 Views

Hi All,

We are in the REM process, We plan to change the existing Routing so that need to include the rework as the operation in the routing.

we are not going to do rework for finished product (i.e after the confirmation). if any problem , we make it as the scrab.

we need to do the rework for the product before final stage of inspection itself . ie. we have a inprocess inspection .

i.e we have a operation called soldering, if this is not done properly, we remove the soldering and do it again as a rework.

1.how to mapp this operation as rework in the routing

2. whether we need to create the separate routing for rework or we can add this rework operation in the same existing routing itself ?

3. if we do rework for the assembly, we can do create the rework, but in the component stage itself

we need to do the rework.

Edited by: raj on Jun 5, 2009 7:37 AM