Hi,
Here is the question which I read in one of the PP blog and couldn't come to the conclusion, so could you guys please bare some time with this and help me to find it out.
Which Availability checks is not possible in Production Order ?
Material
Work Center
Routing
PRT
Thanks in Advance
Hi,
Availability checks is carried out in Production Order for the material mainly and capacity also.
So you can do the Availability checks for
Material & PRT
Work Center ( capacity )
Routing is nothing but the flow of the production. its not related to the Availability checks.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi
In Production order you can calculate the material and PRT availability directly, in that the work center and routing is used for to calculate the capacity availability.
Thanks
S.Murali
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Madhan,
While creating or releasing the production order availability check is carried out for capacity, material & PRT.
So I would say that the work center & routing 'Availabilty check' is not carried out in the production order.
Hope this helps you.
SmanS
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
ATP just considered capacity and material.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
99 | |
11 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.