hi whenever I trfr shipment cost in VI01 to FI system is directly posting

AmalaSrinivasa
Active Contributor
0 Kudos

Hi

Expertese

whenever I trfr shipment cost in VI01 to FI, system is directly creating a PO and a service entry sheet

and is there any control for service entry sheet through release strategy with the relation of shipment cost please let me know

Thanks

SRI

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi,

If you want achieve this through Rel.Strategy then Just check following structure.

CESSR through SE11.

Regards