06-04-2009 10:57 AM
Hi all,
I have created a background job which was triggered by an event 'ZXXX'. When i execute FM BP_EVENT_RAISE, the background job was triggering.
Now I want to delete the event from SM64, but unable to do so as warning appears "Event ZXXX is used in jobs.
So how to delete both of them?
Thanks,
Subba
06-04-2009 11:33 AM
hi,
first u have to delete job which is using the event and than the event.
atul
06-04-2009 12:42 PM
Hi,
I did try that, but again whenever the event is triggering job gets created in SM37.
Thanks,
Subba