Hi All,
R3load -testconnect fails while doing the Export Prepare for the Unicode Conversion. I have upgraded the CRM system from CRM 4.0 to SAP Netweaver 7.0 with EHP1. Now I doing the Unicode Conversion. While using the sapinst as root to start the unicode conversion I am getting the following error:
/usr/sap/CSX/SYS/exe/run/R3load -testconnect [E]
sapparam: sapargv( argc, argv) has not been called.
sapparam(1c): No Profile used.
sapparam: SAPSYSTEMNAME neither in Profile nor in Commandline
/usr/sap/CSX/SYS/exe/run/R3load: START OF LOG: 20090603143131
/usr/sap/CSX/SYS/exe/run/R3load: sccsid @(#) $Id: //bas/701_REL/src/R3ld/R3load/R3ldmain.c#5 $ SAP
/usr/sap/CSX/SYS/exe/run/R3load: version R7.01/V1.4
Compiled Mar 10 2009 23:03:11
/usr/sap/CSX/SYS/exe/run/R3load -testconnect [E]
(DB) ERROR: DbSlControl(DBSL_CMD_IMP_FUNS_SET) rc = 20
(DB) ERROR: DbSlErrorMsg rc = 20
/usr/sap/CSX/SYS/exe/run/R3load: job finished with 1 error(s)
/usr/sap/CSX/SYS/exe/run/R3load: END OF LOG: 20090603143131
Regards
Karthik Ravoori