Jun 01, 2009 at 10:11 AM

Activity type in time sheet

1660 Views

Hi all,

In PS we donu2019t capture any cost. In such case, While entering timesheet, the system through an error message, to enter sender Activity type and it is not allowing to enter timesheet.

Now, what should be done to skip entering activity type and enter timesheet without entering activity type?

I guess it is controlled through work center, by not maintaining costing tab, but the system does not allow to save the work center without entering the cost center under costing tab.

Please suggest, in entering time sheet without activity type

Thanks,

Chandru