cancel
Showing results for 
Search instead for 
Did you mean: 

Automatic Post Goods Receipt on TO confirmation

Former Member
0 Kudos

Hi

Hopefully someone can help with my issue.

Issue: Unable to automatically do a PGR for an Inbound Delivery (IBD) which has an Warehouse managed material and a IM managed material.

Scenario: We use warehouse management and Handling Unit Management. My scenario involves a inbound delivery with 2 lines. The first is for a warehouse managed material. The second is for an IM managed material (It is the packaging material). Upon confirmation of the warehouse transfer order I have the config set so it automatically PGRu2019s the IBD for the warehouse managed material

(SPRO/Logistics Execution/Warehouse Management/Interfaces/Shipping/Define Shipping Control/Define Shipping Control at the Movement Type Level/ at movement type 101 it is set to value 4 ie Do not take WM qty as delivery qty, but post GR/GI)

That works fine for the WM material however the IM line for packaging does not PGR & we have to manually go back to the IBD and do the post goods receipt. The IM line does have a different Movement type (501 as opposed to a 101). It also does not require putaway.

Does anyone know of a trigger I can use to post the entire document? Batch jobs and manually posting the document is not preferred.

Much appreciated,

Adam.

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

FYI - This is not possible as standard.