Hi,

If finished material (MTO) and also semi finished (MTS) both are configurable materials in the same BOM, then what settings i need to do to produce the same.

I can use material variants in MTS scenario i.e to produce semi finished material and keep it in stock.

If a sale order arrives for the finished material then how can I configure the system so that required semi finished material is selected in the BOM here along with the required routing?