Production version selection at MRP process

Dear gurus.

There is requirement of selecting production version at time of creating planned order. Normallly the first version which is available will be picked or the production version as per quota arrangement is picked. We want to pick up the production version manually as options while creating planned order from t code MD02.

Kindly help

Edited by: EKS EKS on May 26, 2009 1:43 PM

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Best Answer
    Posted on May 26, 2009 at 11:45 AM

    Dear EKS,

    While entering the Planned independet Req in MD61 enter the Prod.version the PIR's in MD61 screen

    itself ,first click on the Schedule line tab page and then in the top menu ->settings->prod.version and

    now assign the relevant prod.version here against the PIR values.

    then run MRP so the system automatically pickps up the prod.version.

    The other ways are if you are maintaining a different validity dates or different lot sizes then also the

    system automatically picks up the relevant prod.version.

    Regards

    Mangalraj.S

    Edited by: Mangalraj.S on May 26, 2009 5:17 PM

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.