Hi,

I have a scenario as described below.

A setup matrix with changeover times is defined for a charcteristic (width) in APO.

Planned orders created for the material are always with the std setup time defined in the PPM.

When I run the optimizer in the planning board I want the system to consider the change over timess in setup matrix and reorganise the planned orders to achieve the objective of minimising total changeover time and optimal resource utilisation.

But this is not happening. Even after the optimizer run, the setup times have not changed as per the setup matrix. Could you please suggest what could be the possible reason for this error?