Hi, How to do pre-production planning for the possible production with current resources in a stipulated time and resources required for completion of specified production qty with the stipulated time. i also need to condisder maintenance schedule etc.pls advise.

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Best Answer
    Posted on May 25, 2009 at 03:43 PM

    Dear Yadav,

    In my understanding LTP is one way of doing the pre-production planning for a material or a list of

    material through simulated planning and using the simulated planned orders.

    This can be used for doing vendor analysis and also to check the capacity anaylsis.

    Based on this you can modify the production plan or go for extra shift or extra resources to meet the

    plan or adjust the plan as per the available capacity.

    To know explore more about LTP,check this thread,

    LTP - CM38

    Just hold on for other's suggestions on the same.

    Regards

    Mangalraj.S

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.