cancel
Showing results for 
Search instead for 
Did you mean: 

transport table from DEV to QUALITY/PRD after client copy

Former Member
0 Kudos

Hi, we have DEV client that is a copy of another project, instead QUALITY client is the original.

In QUALITY we have to delete standard entries from customizing table, but these entries in DEV not exist, because they are deleted in the original project.

How we can delete these entries from customizing table in QUALITY?

Thanks.

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

You can request the Basis team to open Quality client and delete the entries directly from Quality or log in through a firefighter id and delete the entries directly from Quality system

Former Member
0 Kudos

Ok, but if I delete the entries directly from QUALITY (because it is yet open) I can't create Change Request to transport in PRD, so we'll have the same problem also in PRD.

Former Member
0 Kudos

you can speak to your basis people. for time being they can allow transport requests to be raised to quality, and then you can delete the entries from quality, and transport the request to Production. else recreate the configs in dev, then delete then and then transport them.