cancel
Showing results for 
Search instead for 
Did you mean: 

Result recording in Preventive maintenance and calibration

Former Member
0 Kudos

Hiiiii Experts,

I need your help.I have created a plan, scheduled it and then order is also generated.Now once the order is generated wheather Preventive or calibration, How I enter ther result into sap.There are some results which are only texts and few are quantity.

Please tell me the steps to record the result.

Regards

Brijesh

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

Hi

Wht are the MIC u r used in Task list referance to that MIC you have to recored it , mostely we are using visual inspection for Calibration

If you are still dought plz revert to me

Regards,

Utkarsh

Former Member
0 Kudos

Hiiiiiiiiii Utkarsh,

Thanks for reply.I am new to PM, Let me explain my req. again.Once the order has been created and user has physically done the inspection task, what are steps need to follow to enter the result into sap so that the report can show the output. There are some outcomes of inspection which are qualitative say for example once the sound in equipment has been cheked it is found that it is double sound. so how the data can been enter into sap.Same way there can be quantitative values also.

There will be some standard way to capture the data.I want to know those steps.I have a bit knowledge of measuring point but i am not clear about that.

Plz let me know the steps one by one if possible.Hope I have explaind my query.

Regards

Brijesh

MTerence
Active Contributor
0 Kudos

Hi

Sorry for the wrong post... i thought ur looking for caliberation process and its inspection

According u to ur query, as an Example...

Basic Scenario - Need to create a Plan, for taking pump vibration measurement in every three months...

Step 1 : Create a Equipment or General Task List (In Operation - Vibration Inpection at different load like 60/80/100) so u have 3 operations to be done once in three months) in IA01

Step 2 : Create a Measuring point for the equipment Pump, where ur taking vibration measurement in IK01, Here u can give upper limit and lower limit.. such that when the user try to enter the measurement more than the value.. it will give a error message...

Step 3 : Create a Maintenance plan.... IP01/IP41

1. Cycle - 3 months

2. Enter the Equipment and the task list

3. Scheduling Period - 1 yr

4. Save it

Step 4 : Schedule the plan in IP10 (You will be getting for call objects for one year)

Step 5 : Once the date as been reached - Order will be called... Go to IP10, enter the Maintenance plan no and select the call and click display

Step 6 : take the respective measurements

Step 7 : Enter the measurements in the measuring documents (IK11)... Save it

Step 8 : In the Order, enter if u have used any material and do Goods issue

Step 9 : Do Confirmation in IW41

Step 10 : Complete the Order, using TECO and Business Complete...

Hope so u r clear...More details check the Help.sap.com...

- Pithan

MTerence
Active Contributor
0 Kudos

HI

Check this out...

[Caliberation Process|http://help.sap.com/saphelp_46c/helpdata/en/fe/67ec5c9d6f11d189b60000e829fbbd/frameset.htm]

- Pithan